Project Description:
Fire upgrade works to the Sleepzone Hostel in Galway. Fire separation works were required on all floors by fitting fireline board to ceilings and walls. All penetrations were sealed with fire mastic and fire batt. A new emergency exit and corridor was created to the rear of the building. All stair landings were seperated from the bedroom corridors. A new automatic fire shutter was installed in the Reception Area to comply with fire regulations.
Fire upgrade works to the Sleepzone Hostel in Galway. Fire separation works were required on all floors by fitting fireline board to ceilings and walls. All penetrations were sealed with fire mastic and fire batt. A new emergency exit and corridor was created to the rear of the building. All stair landings were seperated from the bedroom corridors. A new automatic fire shutter was installed in the Reception Area to comply with fire regulations.
Client:
KPMG
KPMG
Location:
Sleepzone Hostel, Bóthar na mBan, Galway
Sleepzone Hostel, Bóthar na mBan, Galway
Scope of Work:
Refurbishment & Upgrade Works
Refurbishment & Upgrade Works